Front and rear racking ropes provide the means to move the trolley along the boom during operation the ropes being spooled onto a single layer helically grooved drum.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.