For large bridge spans, the main cable can be assembled at the construction site wire by wire through an aerial spinning process. Bridon-Bekaert offers bridge wires with diameter ranging from 5 to 7mm that can be reeled out and spun one by one between the pylons.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.