Sand lines are installed on most drilling and workover rigs, used when swabbing or bailing in the production tubing or wellbore tubulars.
The sand line is typically stored and operated on a winch drum and is part of the rig draw works.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.