Whether you are on to a cable stay design for its lighter foundation, its smart economics, its forward leaning elegance, or its exceptional system stiffness, Bridon-Bekaert is ready to support your project. With an experience that dates back to the early days with the Dusseldorf Cable Stay bridge family in the Europe of the sixties, over our world record Full Locked Coil cables on Bangkok's Rama IX bridge, to the first cable stay bridge with advanced Bezinal3000 corrosion protection, it is in the Bridon-Bekaert DNA to continuously increase the freedom of design, to make the designers imagination as a project's sole constraint.
Stay cable strands and rope assemblies for an elegant pylon to deck connection on your cable stay bridge project