6x19 conveyor haulage ropes. Single parcels of up to 150 tonnes can be supplied reducing the number rope splices to be maintained reducing the total cost of ownership.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.