Tiger Dyform 34LR PI offering high strength, excellent spooling on multi-layer drums, with the highest flexibility. With a PI Intrusion of the core, the rope reaches excellent Diameter stability when high thread pressure becomes an issue.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.